Boiler MACT Compliance: Annual Testing and Burner Tuning

The EPA’s Maximum Available Control Technology (MACT), the emission standard for sources of air pollution, sets forth specific guidelines mandating the maximum possible reduction of harmful emissions, taking both cost and feasibility into account. Under the Clean Air Act Amendments of 1990, MACT must not be less than the average emission limitation achieved by controls on the best-performing 12% of existing sources.

For boilers to successfully meet the EPA’s MACT guidelines, it is crucial to utilize quality boiler equipment and trusted testing/calibration technology. The team at Sigma Thermal understands the importance of MACT testing and compliance, therefore as a supporting service, we frequently guide clients through the process.

 

Meeting MACT Requirements for Boilers

Various factors are involved in determining boiler MACT applicability, but all are predicated on the total potential emission rate, or hazardous air pollutants (HAPs) of the facility itself. Facilities can be categorized as either a “major source” or “area source.” Major source facilities emit or have the capability to emit at least 10 tons of a single HAP, or at least 25 tons of a combination of HAPs, per year. All other facilities fall under the area source category.

Next, determine subcategory allocation. The subcategory depends on the type of boiler design (stoker, fluidized bed, etc.), the size of the unit, the type of fuel being burned, and whether the fuel type is a new or existing classification.

Initial boiler tune-ups must be carried out by applicable compliance dates, after meeting the initial compliance requirements for boiler MACT.

All existing major boiler units should be subjected to a one-time energy assessment. This assessment includes an inspection for cracks or corrosion, overall evaluation of operation, inventory of energy-consuming systems, and review and recommendations for plans and practices including cost and efficiency measures.

Extensive performance tests are also required for units that are subject to emission limits. Performance tests for existing units must be conducted and in place within 180 days of the compliance date.

After assessment and performance tests, compliance can then be determined. If your boiler emission limits fail to meet the requirements, alternative options are available. Such options include boiler replacement, retrofit or modification of the boiler in order to switch the subcategory, or making adjustments to the way a multi-fuel boiler is operated so it can function under a different subcategory.

To avoid the risk of non-compliance and consistently meet ongoing MACT requirements, companies may make use of air pollution control devices and CEMS (continuous emission monitoring systems) while keeping close track of operating parameters and associated records. Additionally, regular tune-ups should be pre-scheduled and conducted, and all required compliance reports should be submitted in a timely matter.

 

EPA Regulations

The EPAs Compliance and Emissions Data Reporting Interface (CEDRI) requires companies to submit all performance test results and notification reports (including periodic reports).

Although MACT policies are not currently enforced, boiler owners/operators cannot plead ignorance to the law if found to be non-compliant. The lack of recordkeeping or performing timely compliance activity could be subject to an audit that could potentially produce retroactive penalties and fines (up to $25,000 per day). Boiler issues that may lead to non-compliance include fouling on the heat transfer surface or boiler operation outside of the normal combustion range.

 

Annual Testing and Burner Tuning

Sigma Thermal works closely with clients across a range of industries to help ensure that their heating equipment is compliant and its operation remains reliable. Our clients take advantage of prescheduled periodic servicing, also known as Sigma’s Total Customer Care Program, which includes annual testing, burner tuning, and other preventative maintenance. Members of this program also receive priority scheduling, fixed service rates for three years, a 5% discount on all spare parts, access to our 24-hour priority customer support line, and access to a growing library of helpful how-to videos covering common maintenance tasks and service issues.

To become a member or to learn more about our Total Customer Care Program, connect with us today.

7 Things to Consider for Successful Spare Parts Management

Most companies are reluctant to maintain a comprehensive spare part inventory because they fear that stocking assets like spares is counterintuitive when trying to effectively control operating costs. They expect plant managers to identify ways to reduce cost while maintaining the performance and efficiency of plant operations.

Manage Your Inventory

Practical spare part management is the foundation for reliable plant operation and is crucial to a plant managers success. As plant manager, you need to know how to determine which spare parts are needed to make up an effective and comprehensive inventory system. Rather than using perception to determine what’s needed, it’s best to establish a strategic method that will adequately manage the movement and storage of your inventory.

Operating strategy, inventory control and lead times are a few of the factors you should consider when developing or reviewing your part management system. Taking these factors into account can help minimize performance disruption, promote efficiency, and reduce carrying cost. Ultimately, producing successful spare part management.

Operating Strategy

Parts WarehouseAs a parts manager, you will either operate from a predictive or reactive position. Most companies fall into the habit of building their management strategy around reactive events. To successfully manage part inventory a manager should adopt a predictive strategy. While reactive management can be beneficial during a crisis, the essence of successful management is the ability to prevent problems before they arise.

Predictive management of spare parts includes the collection and analysis of data, and the ability to look at the entire scope of operation to locate and solve important underlying problems that may surface in the long run. In relation to collecting and analyzing data, be sure to look out for patterns of failure that can reveal problems that are not clearly visible. Predictive management will help you to make better use of resources, cutting the time and cost associated with fixing issues.

Source of Stockout

It is impossible to eliminate the nagging issue of stockout (out of stock parts) without investing in spares.  However, if you try to identify the major cause(s) of your stockout you can limit the effects it has on your operation. Start recording the reason(s) for out of stock parts in real time. Additionally, review forecasted demand and look for parts that may have an incorrect order setting. It should be noted that the most typical cause for stockout is the delay that may exist within a supply chain (internally/externally).

Inventory Control

Your spare parts inventory does not have to be all-encompassing to be effective. In fact, it is unrealistic to stock large quantities of various parts. To achieve better control over inventory, develop clear criteria that will help define and categorize spares. Designations such as “critical” spares can help you prioritize your inventory. Recognize that terms like this are multi-dimensional, and can be refined further. For instance, a part can be labeled as critical to the operation or critical to specific machine function. A higher priority may be given to one designation over another, depending on its risk and impact if a failure should occur.

Tip: Periodically review all spare parts classifications (i.e. critical and non-critical) since the classification of a part could change over time, based on replacements/substitutes that may become available. A regular review of spares for excess stock can help to reduce cost too.

Properly storing and organizing spares in a designated, secure space is also beneficial for the control of inventory. A prompting for reorder will not take place if a part is taken without a record. Likewise, if new stock is placed on the shelf without a record, it cannot be accounted for. A review and analysis of your storage and check-out system can reveal reasons for stock inaccuracies.

Lead Times

Having a thorough understanding of spare part lead times is critical to building a successful stock program. Part lead time is particularly important when determining which parts to stock. If downtime is not critical for your company, parts that can be acquired quickly and easily can be left out of a stocking plan. However, if lost production time means a significant financial loss for your operation, even a day or two without a part can be too long. Many parts with long lead times are made to order and do not carry expediting options.  Therefore, it is best to keep parts with long lead times on hand.

Tip: Off-brand components that can be obtained more quickly may present themselves as a viable substitute during a crisis. However, you should keep in mind that for certain equipment, these substitute/alternative parts could cause further damage to your equipment or system.

New Equipment is No Exception

Working on equipmentAll too many times we hear the following from operations and maintenance mangers: “Our equipment was just installed, it’s brand new, and we don’t need spares.” While it sounds logical for many reasons, this train of thought is wrong. There is also an assumption that vendors will supply perfectly functioning, quality parts (and they typically do). But, unfortunately, part failure upon startup is a common occurrence.

Having proper spares on hand for the start-up/commissioning of new equipment is extremely important. If a part is found to be defective, you can mitigate downtime by having spares available for replacement right away.

Tip: Work with your operations department to ensure that your budget includes funds for spare parts. Equipment vendors can also provide you with a list of recommended spares; sometimes lead times will be given for each part. Utilizing this information, you can better decide which parts need to be kept on hand.

True Stories

It may help to hear about a few real-world examples of issues that occurred because spares were not kept on hand–

An oriented strand board (OSB) production facility had a set of grate bars that required immediate replacement. They did not have spare grate bars on hand, so 8,000 pounds of grate bars had to be ordered and delivered via specialty courier. Even with expedited delivery (which was quite expensive), production was still down for more than three full days. If these spares had been kept in stock, the expense and lost production time could have been avoided.

In another case, a large building materials company discovered they had a faulty flame scanner. Despite a price tag of less than $300, the company did not keep additional scanners on hand. The original equipment manufacturer had the part in stock and could ship it out immediately, but the building materials company still lost a full 24 hours of production time while it was being shipped overnight. The loss of production time during the 24 hours cost them approximately a quarter of a million dollars.

Calculate Your Risk

Inevitably, equipment will fail but taking some time to calculate the risk of downtime can help solidify your decision to stock parts. Making your life a whole lot easier.

Tip: To calculate risk, you need to know what one hour of downtime will cost your company. Working from this information and factoring in lead times, you can determine the cost of an unexpected shutdown. Then compare that to the cost of purchasing and storing replacement parts. You can make an informed decision based on this analysis. Keep in mind, even if the supplier has the part in stock, getting it to the site will cost a plant a minimum of 24 hours of unscheduled downtime.

Example: $10,000 (hourly cost of downtime) x 36 hours = $360,000

Manage Your Inventory

Learn More

Sigma Thermal is an experienced process heating systems OEM. Commitment to and support of our customers is the foundation of our business. As a part of this commitment, we offer our Total Customer Care Program to all customers. With this program we can help our clients limit the downtime and costs related to unexpected maintenance issues.

Program benefits include:

Visit our Total Customer Care webpage to learn more about Sigma’s spare part capabilities or to sign up for Sigma’s free, comprehensive Total Customer Care Program.

Why You Should Stock Spare Parts for Your Heating System

Industrial facilities rely on a variety of equipment to support their vital processes. Factors such as increases in customer demand and exceptionally harsh applications can be taxing on the equipment, causing equipment malfunction or failure that takes production off-line.  For this reason it is imperative for facilities to keep the most crucial spare parts on-hand, preventing costly interruptions or shutdowns.

IMG_9674Many professionals tend to avoid the practice of stocking parts, but there are numerous benefits to this method. One such benefit is cost savings.  Assuming your plant is operating around the clock, you could potentially save thousands of dollars by having critical items readily available.

You should check to make sure that all the components of your Sigma Thermal heating system are in good working order for maximum performance and minimized interruptions. Part failures are common throughout industrial facilities; these issues often lead to extensive equipment downtime, which can range anywhere from a few days to several weeks.

skid-blogSigma Thermal warranties cover most damaged components, but due to the wide range of components we source, it’s difficult to have every item in stock.  Many of the parts have lengthy lead times—in some instances it may take up to ten weeks to receive the desired part. Our warranty can cover the replacement cost of the spare part, but what if you have start up technicians on-site? If you don’t have the necessary parts in stock, you will have to bear the cost of having technicians on standby until the replacement part is received.

Even if you are outside the warranty period, consider having spare parts on hand to help keep your heater running at optimal levels. If we have the part you need on the shelf, our team will gladly ship it via small package or freight service—next day or same day service is available in many cases.

No one wants to be held responsible for costly shut downs, so be sure to keep an adequate inventory of spare parts on hand.

Contact us today to make sure the spare parts you’re looking for are in our inventory.

Contact Sigma Thermal About Ordering Spare Parts

Reference Center

Our Blog

Boiler MACT Compliance: Annual Testing and Burner Tuning

The EPA’s Maximum Available Control Technology (MACT), the emission standard for sources of air pollution, sets forth specific guidelines mandating the maximum possible reduction...

READ MORE

Sigma Thermal Partners with ElectraTherm for Next Generation Emission Reduction System Plus Power

Integrated Waste Gas to Power Solution (MARIETTA, GA., – August 29, 2018) – Sigma Thermal is pleased to announce their partnership with ElectraTherm to offer a...

READ MORE